Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u609025431/domains/mahmoud-samy.com/public_html/river/river-new/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u609025431/domains/mahmoud-samy.com/public_html/river/river-new/wp-includes/functions.php on line 6131
26th of July corridor -AL Zumor Intersection - River

26th of July corridor -AL Zumor Intersection

Company
The Arab Contractors
Hassan Allam
Gharably Integrated Engineering Co. S.A.E

Owner
General Authority for Roads and Bridges

location
Giza Egypt
Date
April, 2022

Description
AL ZUMOR AXIS starts from the ring road in the south "Al-Mounib area" and up to the Tahya Misr axis in the north with a length of 14.8 km in Giza Governorate (the project includes the implementation of surface asphalt roads, some industrial works and overhead roads due to the presence of many intersections, axes and residential areas) It intersects with a number of axes, namely: The Ring Road "Al-Warraq - Al-Muneeb" - 26th of July Corridor - Saft Al-Laban Axis - Upper Shaer Faisal Bridge - Bridge above Al-Haram Street - Tahya Misr Axis.
Type Size
Total Supplied: 981

Owner

Consultant

Company

Company

Company

Project Gallery