Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u609025431/domains/mahmoud-samy.com/public_html/river/river-new/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u609025431/domains/mahmoud-samy.com/public_html/river/river-new/wp-includes/functions.php on line 6131
El-Tameer Axis Intersection Bridge with Sidi Kerir Road Link, North Coast - River

El-Tameer Axis Intersection Bridge with Sidi Kerir Road Link, North Coast

Company
Qasid khier
Al Gharably
Al Mutahida

Owner
Engineering Authority Of The armed force

location
Alexandria Egypt
Date
April, 2022

Description
The axis extends for a length of 35 km in the distance from its intersection with the Cairo / Alexandria Desert Road to Sidi Kerir / Airport Road. The development process included the construction of a service road on both sides with 3 lanes in each direction (the first phase with a length of 14 km) in the distance from the sea arm to Corridor 54 To serve the movement of trucks to the ports of Alexandria and Dekheila.
Type Size
Total Supplied: 4004
Type
Thorma Asphaltic Plug Joints
Total Supplied: 785m

Owner

Consultant

Company

Company

Company

Project Gallery