Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u609025431/domains/mahmoud-samy.com/public_html/river/river-new/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u609025431/domains/mahmoud-samy.com/public_html/river/river-new/wp-includes/functions.php on line 6131
Joseph Tito Corridor Intersection with Abdel Hamid Badawi - River

Joseph Tito Corridor Intersection with Abdel Hamid Badawi

Company
EDECS For Engineering & Contracting

Owner
Engineering Authority Of The Armed Forces

location
Cairo.Egypt
Date
January, 2023

Description
The "Ring Road - Joseph Tito - Al-Nasr" axis with a length of 21 km, the development work included the development of the highway and the construction of 5 new bridges, and the development of the Cairo / Suez Road.The capital witnessed a large number of development works in traffic axes, and the establishment of a new number to solve traffic crises, which came to fruition due to the speed of implementation, including the axis of "Ring Road - Joseph Tito - Al-Nasr" with a length of 21 km, during the month of June 2020, and the development work included the development of the highway and the construction of 5 new bridges
Type
Thorma Asphaltic Plug Joints
Total Supplied: 350m

Owner

Company

Project Gallery