Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u609025431/domains/mahmoud-samy.com/public_html/river/river-new/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u609025431/domains/mahmoud-samy.com/public_html/river/river-new/wp-includes/functions.php on line 6131
Arab Al-Raml/Ajhur Al-Raml Bridge Project - River

Arab Al-Raml/Ajhur Al-Raml Bridge Project

Company
General Nile for roads and bridges

Owner
General Authority for roads and bridges

location
Alexandria - Egypt
Date
October, 2020

Description
The Arab Raml Bridge / Upper Sand Bridge project with a length of 1500 m and a width of 12 meters at an estimated cost of approximately (150) million pounds, and the project is scheduled to be completed in 2022. The project consists of (three traffic lanes 3.5 m for each direction, with a total of 24 m.
Type Size
Total Supplied: 88

Owner

Consultant

Company

Project Gallery