Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u609025431/domains/mahmoud-samy.com/public_html/river/river-new/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u609025431/domains/mahmoud-samy.com/public_html/river/river-new/wp-includes/functions.php on line 6131
Khazan Aswan Bridge - River

Khazan Aswan Bridge

Company
The Arab Contractors

Owner
General Authority for Roads and Bridges

location
Aswan - Egypt
Date
January, 2021

Description
The Axis will be linked with the "Aswan-Cairo West" road that is being developed, which will be part of the "Alexandria/Cape Town" axis in South Africa, and its length is 5.5 kilometers, and its width is 30 meters, by 3 lanes in each direction, and the part that will rise above the Nile is 320 meters, and it will be "Mg Bridge - Suspension"
Type Size
Total Supplied: 481

Owner

Consultant

Company

Project Gallery